Painting To Begin Soon

10981517_10152832643988581_5986673558697724899_nOutside painting and repairs will begin very soon at the Roseboro. All of the lattice skirting will come off and be replaced. The porch wood railings need to be repaired as much of it has rotted. Painting will begin as soon as we have some warm days. There is too much exterior painting to do to have it done by the Garden Party at the end of May. The challenge will be to get as much done as possible while still having it look presentable for the upcoming festival. The colors are changing so we may only get the porch and first floor done by the end of May. The lobby bathrooms are currently under construction as is the Holland House wing. Things are happening!